DATE:06/06/2011 LABOR
MANAGEMENT SYSTEM PAGE: 1
TRAIN AND ENGINE SERVICE BULLETIN
REPORT
ZONE: ZONE
2
BULLETIN NUMBER: 25
BULLETIN TYPE: ON CORRIDOR ENGINEERS
BID OPEN DATE: WEDNESDAY
06/08/11 BID CLOSE DATE: SATURDAY
06/11/11 AWARD DATE: THURSDAY
06/16/11
VACANCY JOB CYCLE
SIGN-UP DEPART ARRIVAL SIGN-OFF
NUMBER SYMBOL WEEK <------ DAYS OF WORK ------> LOC---TIME LOC---TIME
LOC---TIME LOC---TIME
CREW BASE: HARRISBURG,
PA (ZN 2)
EXTRA BOARD
215 EXR704 1 SUN MON TUE WED THU SAT XBD
115 EXR720 1 SUN MON TUE WED FRI SAT XBD
CREW BASE: NEW YORK, NY
(ZN 2)
NEW YORK, NY TO WASHINGTON, DC
216 ENW727 1 SUN SAT 153
NYP 7:25 A NYP
8:05 A WAS 11:30 A WAS 11:40 A
1 156
WAS 1:05 P WAS
2:20 P NYP 5:46 P
NYP 5:56 P
1 MON TUE WED 2121
NYP 1:20 P NYP
2:00 P WAS 4:47 P
WAS 4:57 P
1 198
WAS 8:05 P WAS
8:45 P NYP 12:10 A NYP 12:20 A
EXCEPTION
DATE: MON,07/04/11 161 NYP
1:14 P NYP 2:05 P
WAS 5:30 P WAS
5:40 P
198 WAS 8:05 P WAS
8:45 P NYP 12:10 A NYP 12:20 A
EXCEPTION
DATE: MON,09/05/11 161 NYP
1:14 P NYP 2:05 P
WAS 5:30 P WAS
5:40 P
198
WAS 8:05 P WAS
8:45 P NYP 12:10 A NYP 12:20 A
.
YARD ASSIGNMENTS
218 EYSP701
1 SUNNYSIDE YARD RELAY
1 SUN WED THU FRI SAT YRD SSY 6:00 A SSY 2:00 P
SUN:
SUNNYSIDE YARD RELAY
WED:
SUNNYSIDE YARD RELAY
THU:
SUNNYSIDE YARD RELAY
FRI:
SUNNYSIDE YARD RELAY
SAT:
SUNNYSIDE YARD RELAY
DATE:06/06/2011 LABOR
MANAGEMENT SYSTEM PAGE: 2
TRAIN AND ENGINE SERVICE BULLETIN
REPORT
ZONE:
ZONE 2
BULLETIN NUMBER: 25
BULLETIN TYPE: ON CORRIDOR ENGINEERS
BID OPEN DATE: WEDNESDAY
06/08/11 BID CLOSE DATE: SATURDAY
06/11/11 AWARD DATE: THURSDAY
06/16/11
VACANCY JOB CYCLE
SIGN-UP DEPART ARRIVAL SIGN-OFF
NUMBER SYMBOL WEEK <------ DAYS OF WORK ------> LOC---TIME LOC---TIME
LOC---TIME LOC---TIME
CREW BASE: NEW YORK, NY
(ZN 2)
EXTRA BOARD
217 EXN853 1 SUN MON TUE THU FRI SAT XBD
CREW BASE: WASHINGTON
TERMINAL
YARD ASSIGNMENTS
220 ESH739B 1 MON TUE WED THU FRI YRD WUT 3:00 P WUT 1:00 A
MON:
S/U @ COACH YARD
TUE:
S/U @ COACH YARD
WED:
S/U @ COACH YARD
THU:
S/U @ COACH YARD
FRI:
S/U @ COACH YARD
219 ESU763C 1 SUN WED THU FRI SAT YRD WUT 11:59 P WUT
7:59 A
NATIONAL
RAILROAD PASSENGER CORPORATION
WORK ZONE 2
ENGINE SERVICE
AWARDS TO BULLETIN # 24
DATED: JUNE 01,
2011
AWARDS
EFFECTIVE: JUNE 09, 2011
“IF YOU ARE AWARDED AN
ASSIGNMENT FOR WHICH YOU ARE NOT FULLY QUALIFIED, YOU MUST NOTIFY YOUR
IMMEDIATE SUPERVISOR”.
CREW
BASE: BALTIMORE, MD
NONE
CREW
BASE: HARRISBURG, PA (ZN 2)
206 EHP708 R.
HAMMER JR. 1361 EXR704
CREW
BASE: NEW YORK, NY (ZN 2)
213
ENW734 J.
BAXTER 927 ENW727
214 EYDR702 R. MCGOVERN 1130 EXN853
211
EXN803 E. BUTZ 1309 EYSP701
CREW
BASE: PHILADELPHIA, PA
215
EKP-701 C. T. DIGGINS PR 396 SAME
CREW
BASE: WASHINGTON,D.C.(ZN 2)
212
EXW806 C.
ANDERSON 1348 ESU763C
CREW
BASE: WASHINGTON TERMINAL
202 ESW709A R.
A. BECRAFT 74 ESH739B
207 EXL790 S.
HINES 1304 SAME
PREPARED BY STEPHEN CERMINARA @ ATS 734-2382 FOR ANNE RANDOLPH @ ATS 728-2381